How to find and check a reliable electrician in the UK

Check the person, the business and the actual job
Start with the job you need: a fault investigation, socket addition, inspection or larger installation. Ask whether the electrician is competent and experienced in that work and that type of property. HSE says competence depends on the work; a directory entry or good review alone does not establish suitability for every installation.
For domestic work, check the business through its electrical scheme's own register. Match the registered name and address with the quote. If a subcontractor will attend, ask who is carrying out, testing and signing for the work. For a shop, office or other premises, explain the installation and operational requirements before assuming a domestic qualification or listing covers them.
Once you can describe the job, request an electrician quote.
Use the official register rather than a logo
- Ask which scheme the business belongs to and for its registration details.
- Search the NICEIC or NAPIT directory, or the relevant operator named on GOV.UK's scheme list.
- Check that the result matches the business sending the quote and covers the work proposed.
- If a name differs or no result appears, ask the operator to clarify before relying on the claimed registration.
Search live at the time of booking. A logo, saved card photo or an old register result does not establish current membership. Check insurance cover for the actual work and ask for its current evidence; do not infer it from registration.
Sources: GOV.UK: find a competent person scheme for building work, NICEIC: find a tradesperson, NAPIT: find a member
Agree building control and electrical certificates separately
In England, Part P concerns electrical safety in dwellings. For work requiring building regulations notification, an appropriately registered competent person can self-certify within their scheme's scope; otherwise building control arrangements are needed. Ask how notification will be handled before work starts. Wales, Scotland and Northern Ireland have their own building control rules: confirm the route for the property's jurisdiction.
Building regulations compliance documentation and the electrical installation or minor works certificate are different records. Ask which applies to your scope, who issues it and when you receive it. An EICR reports an installation's condition; it does not replace certification for new installation work.
Sources: GOV.UK: find a competent person scheme for building work, GOV.UK: Approved Document P, England dwellings
Give every contractor the same useful brief
- Work: the symptom or change required, fittings and locations; investigation where the cause is unknown.
- Property: home, rented home or business premises; occupied areas and relevant existing reports.
- Photos: visible fittings from a safe position, without opening electrical equipment.
- Access: agreed hours, parking, keys or escort contact and restrictions.
- Interruption: equipment that cannot lose power and the person who can agree isolation.
- Decisions: work approver, confirmed payer and who receives completion documents.
Say what you have observed without diagnosing it. “The socket stopped working after the room was painted” is useful; “replace the socket” may skip a fault elsewhere. Do not recreate a shock, overheating or tripping fault for a quotation photo.
Compare the full scope before agreeing the price
Read labour, materials, cable routes, access equipment, testing, documents and making good together. Ask whether plaster repairs and final decoration are included. For exploratory fault finding, agree the charging basis, a limit and who approves further work.
Fictional comparison: one offer for an extra socket includes the cable route, a specified fitting, testing and wall repair. Another prices the fitting only. Ask for the missing scope before comparing totals. A socket replacement, additional point and new circuit are different jobs: use the socket installation scope guide and quote comparison checklist.
Agree start and return visits, payment terms and how changes are approved. For EICR observations, send the complete report and use our remedial work quote brief.
Keep the handover with the job record
Before the visit, agree who receives the work summary and the relevant certificates or test records. At handover, compare the completed scope with the accepted quote and record unfinished items. Keep the quote, approved changes, invoice and electrical documents together.
If a certificate or item is missing, ask the contractor directly with the quote reference and record the response. If necessary, use the scheme operator's complaint route. An invoice, review or reassuring message is not the electrical completion evidence you agreed.
Tell us the electrical job you need doing. Include the property use and anything affecting access or testing.
What needs doing?
Tell us what you need done. We'll tell you the price, then find a local tradesperson to do the job.
Sources and references

Blake Folgado
Blake is a co-founder of Tradehand, a UK trades marketplace More from Blake








