What the Solar thermal service record covers
Record the collector and hydraulic circuit, heat-transfer fluid and frost protection, pressure, expansion and control readings. Keep separate records for unvented, gas or electrical work.
Who needs one
- The named person recording work actually performed.
- The customer retaining the findings, procedures and handover documents.
Related templates.
More free certificates.

Electrical
Electrical Installation Condition Report
Full BS 7671 condition report: circuits, test results, C1–C3 & FI codes, Satisfactory/Unsatisfactory outcome.

Electrical
Electrical Installation Certificate
Certify new circuits, installations and consumer unit changes: BS 7671 design, construction and test declarations.

Electrical
Minor Electrical Installation Works Certificate
Certify additions and alterations to existing circuits: the lightweight BS 7671 counterpart to an EIC.
Questions sole traders ask
Is this an official certificate?
This is a voluntary Tradehand work record. It records the scope and evidence shown here; official issuer documents and technical procedures stay separate.
What is included?
Equipment identity, procedure reference, the specific readings and work fields shown below, defects and actions, handover and named-person sign-off.







