Snagging List Template

What is it?
A snagging list is a document used at the end of a building project to record every minor defect or incomplete item that needs to be put right before the job is considered finished. Each entry typically notes the location, a description of the defect, the trade responsible, a priority rating, the date it was raised, and the date it was resolved. It is produced during a snagging inspection, usually a walk-through by the builder, client, or an independent inspector, and is signed off once every item has been completed.
About this template
A snagging list is one of the most important documents in the final stage of any building project. It is the structured record of every defect, unfinished item, and quality issue identified before a job is handed over to the client. Without a clear snagging list, handovers become disorganised, disputes drag on, and final payments stall. A good snagging list protects the builder as much as the client: it proves which items were outstanding, shows the work was completed methodically, and gives a clear, agreed point at which the project is signed off as finished. Builders who walk the job with a proper snagging list close projects faster and get paid sooner.
When to use
- At practical completion of a building project, before the client takes occupation or makes the final payment
- During a pre-handover walk-through with the client to agree outstanding items together
- On new build and renovation projects to track finishing defects across multiple trades
- When an independent snagging inspector has been engaged and their findings need recording in one place
- Throughout the final fortnight of a job to capture issues as subcontractors complete their work
- At the end of a defects liability or rectification period to confirm everything has been put right
Tips
- 1Walk the job with the client rather than handing them a finished list - agreeing snags together prevents new items appearing weeks later and keeps the relationship positive
- 2Be specific in every description - 'paint chip on architrave, left of bedroom 2 door, approximately 20mm' is far more useful at remedial stage than 'paintwork damaged'
- 3Photograph every significant snag at the time it is raised and again once resolved - paired before-and-after photos settle most disputes instantly
- 4Assign each snag to a named trade and a target date - an unassigned list with no deadlines simply does not get cleared
- 5Distinguish genuine defects from change requests - if the client asks for something that was never in the contract, record it as a variation, not a snag, so it can be priced and charged correctly